{"id":43314,"date":"2023-03-06T16:45:15","date_gmt":"2023-03-06T21:45:15","guid":{"rendered":"https:\/\/www.flexpipeinc.com\/?p=43314"},"modified":"2025-11-20T14:39:24","modified_gmt":"2025-11-20T19:39:24","slug":"5s-guide-a-lean-manufacturing-tool","status":"publish","type":"post","link":"https:\/\/www.flexpipeinc.com\/us_en\/5s-guide-a-lean-manufacturing-tool\/","title":{"rendered":"5S Guide &#8211; A lean manufacturing tool"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h1 class=\"wp-block-heading has-black-color has-text-color\">What Is the 5S Method in Lean Manufacturing?<\/h1>\n<\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<p>The 5S method is a structured workplace-organization system used across US manufacturing operations to reduce waste, improve productivity, and strengthen safety. Built around five core steps: <strong>Sort<\/strong>, <strong>Set<\/strong> in Order, <strong>Shine<\/strong>, <strong>Standardize<\/strong>, and <strong>Sustain<\/strong>. 5S creates a clean, organized, and efficient work environment that supports lean thinking and continuous improvement.<\/p>\n\n\n\n<p>5S originated within the Toyota Production System but has been widely adopted in the United States by manufacturers, warehouses, maintenance teams, and service industries. Its appeal comes from its low cost, high impact, and adaptability to nearly any workspace.<\/p>\n\n\n\n<div style=\"height:5px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"217\" height=\"335\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-53.png\" alt=\"Toyota Motor Co Vice President Taiichi Ohno\" class=\"wp-image-43206\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-53.png 217w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-53-16x24.png 16w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-53-23x36.png 23w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-53-31x48.png 31w\" sizes=\"auto, (max-width: 217px) 100vw, 217px\" \/><figcaption class=\"wp-element-caption\">Toyota Motor Co Vice President Taiichi\nOhno poses on August 1, 1978 in Toyota,\nAichi, Japan\nSource: Wikipedia<\/figcaption><\/figure>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h2 class=\"wp-block-heading\">The TPS Legacy<\/h2>\n\n\n\n<p>The world of lean manufacturing owes a great deal to Sakichi Toyoda, his son Sakichi Toyoda and a highly-respected Japanese engineer named Taiichi Ohno. Together they created the Toyota Production System (TPS) and introduced several simple &#8211; but highly effective &#8211; business principles that continue to produce results and improve manufacturing efficiencies to this day.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Minimize waste &#8211; Maximize efficiencies<\/h2>\n\n\n\n<p>One of these principles is 5S, a continuous improvement methodology widely recognized as a building block of lean manufacturing. 5S spearheaded the rise of just-in-time (JIT), a supply chain management and lean manufacturing process that minimizes waste while maximizing efficiencies.<\/p>\n\n\n\n<p>5S is an acronym for five Japanese words: seiri, seiton, seis\u014d, seiketsu, and shitsuke. When translated, they become the pillars of a repeatable process that simplifies workplace structure, organization, and cleanliness.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image is-style-default\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"377\" height=\"393\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-359.png\" alt=\"5S\" class=\"wp-image-43214\" style=\"width:550px;height:573px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-359.png 377w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-359-375x391.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-359-24x24.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-359-46x48.png 46w\" sizes=\"auto, (max-width: 377px) 100vw, 377px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">What are the steps to 5S ?<\/h2>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-f87ecde39cb35c2ba768de8430e99735\">Each of the five S\u2019s works together to eliminate waste and optimize the workplace.<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-size_lg is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"947\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-1280x947.png\" alt=\"\" class=\"wp-image-43858\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-1280x947.png 1280w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-768x568.png 768w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-500x370.png 500w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-800x592.png 800w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-375x277.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-1024x758.png 1024w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-24x18.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-36x27.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4-48x36.png 48w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-4.png 1384w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>5S is ultimately about adopting repetitive behaviors and practices to standardize a company\u2019s work environment. 5S is the all-important first step to ensure the repeatability of work processes; defining guidelines for workplace management, structure, organization, and cleanliness helps to eliminate time-consuming work stoppages, interruptions, waste, and delays. The result is more predictable outcomes and improved quality.<\/p>\n\n\n\n<p>On the surface, 5S appears to be a simple set of rules that are easily implemented and followed. However, go a step further, and it becomes clear that 5S only succeeds when companies remain committed to the process.<\/p>\n\n\n\n<p>This is not a one-time exercise. It\u2019s not a set-it-and-forget-it solution. 5S requires a committed workforce with the discipline to follow the process daily. It must become part of a company\u2019s culture so that the habit of following 5S steps becomes ingrained in the workforce. Here is a breakdown of 5S alongside some questions and issues to consider for each step.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">1) Sort (Seiri)<\/h3>\n\n\n\n<p>Remove what\u2019s unnecessary. Teams eliminate clutter, scrap, outdated tools, and unused equipment to ensure only essential items remain. In US plants, Sort often begins with a <strong>red\u2011tagging process<\/strong>, where questionable items are temporarily moved to a review area.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"692\" height=\"259\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1.png\" alt=\"Sort\" class=\"wp-image-43222\" style=\"width:901px;height:337px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1.png 692w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1-375x140.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1-24x9.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1-36x13.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-1-48x18.png 48w\" sizes=\"auto, (max-width: 692px) 100vw, 692px\" \/><\/figure>\n\n\n\n<p>Ensure that only the things needed to perform work tasks remain within the work cell.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>What items are critical to performing work tasks?<\/li>\n\n\n\n<li>What items are non-value-added?<\/li>\n\n\n\n<li>If you\u2019re unsure whether an item or tool is always needed, set it aside. If it\u2019s not used over the next couple of weeks, then it\u2019s not a critical item.<\/li>\n\n\n\n<li>Does it make sense to group some items, and if so, where will they be placed?<\/li>\n<\/ul>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">2) Set in Order (Seiton)<\/h3>\n\n\n\n<p>Arrange essential items for maximum efficiency. This step focuses on visual management\u2014clear labeling, designated storage zones, shadow boards, color\u2011coded tape, and signage compliant with common US safety standards.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"395\" height=\"385\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2.png\" alt=\"Set in order\" class=\"wp-image-43226\" style=\"width:400px;height:390px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2.png 395w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2-375x366.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2-24x24.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2-36x36.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Mask-group-2-48x48.png 48w\" sizes=\"auto, (max-width: 395px) 100vw, 395px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Adopt an ergonomic approach to organizing the items that remain. Ensure items are correctly identified so operators or technicians can access them safely, efficiently, and quickly. Every material, tool, work instruction, or consumable must have a designated location and be appropriately labeled and easily accessible.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Is everything properly identified and labeled?<\/li>\n\n\n\n<li>Do employees have to reach, bend, or stretch too much to reach tools and items?<\/li>\n\n\n\n<li>Is there a natural flow and progression to storing and organizing items?<\/li>\n\n\n\n<li>Have you adopted an ergonomic mindset to how items are placed?<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<p><a href=\"https:\/\/www.flexpipeinc.com\/us_en\/shadow-boards\/\" target=\"_blank\" rel=\"noreferrer noopener\">Shadow boards<\/a> make it easy to create outlines of parts and use placement holders so that everything fits exactly where it is supposed to.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">3) Shine (Seiso)<\/h3>\n\n\n\n<p>Clean the area and inspect equipment. Shine goes beyond housekeeping; it uncovers defects, maintenance issues, leaks, or misalignments. Many US facilities incorporate Shine into daily shift\u2011change routines.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"217\" height=\"258\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/5s-board_president-container-1.png\" alt=\"Shine\" class=\"wp-image-43230\" style=\"width:400px;height:475px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/5s-board_president-container-1.png 217w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/5s-board_president-container-1-20x24.png 20w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/5s-board_president-container-1-30x36.png 30w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/5s-board_president-container-1-40x48.png 40w\" sizes=\"auto, (max-width: 217px) 100vw, 217px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p><a href=\"https:\/\/www.flexpipeinc.com\/us_en\/my-shining-experience\/\" target=\"_blank\" rel=\"noreferrer noopener\">Ensure the workspace is clean<\/a>, well-maintained, organized, and free of obstructions. An end-of-day or end-of-shift cleanup is an absolute must. This can involve sweeping or mopping the floor, wiping down and cleaning tools and workbench surfaces, or ensuring that equipment and machinery are properly maintained and cleaned.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Is it easy to clean up, and are the tools, equipment, and workbenches easily accessible?<\/li>\n\n\n\n<li>Does the employee clearly understand how to maintain their workplace?<\/li>\n\n\n\n<li>Will you need to train the employees on cleanliness?<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"555\" height=\"177\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22.png\" alt=\"Shine - Before &amp; after\" class=\"wp-image-43238\" style=\"width:903px;height:288px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22.png 555w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22-375x120.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22-24x8.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22-36x11.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-22-48x15.png 48w\" sizes=\"auto, (max-width: 555px) 100vw, 555px\" \/><\/figure>\n<\/div>\n\n\n<p>A <a href=\"https:\/\/shop.flexpipeinc.com\/us_en\/kit-crib-the-flexpipe-crib\" target=\"_blank\" rel=\"noreferrer noopener\">Flexpipe crib<\/a> is a perfect way to standardize a workplace. It makes the workplace more visually appealing and cuts down on wasted time looking for parts, materials and consumables.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">4) Standardize (Seiketsu)<\/h3>\n\n\n\n<p>Create consistent procedures and expectations across shifts and teams. Standardize includes photos, checklists, color coding, cleaning schedules, and workstation standards that make it easy for anyone to maintain the established order.<\/p>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"345\" height=\"487\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/less-more-operating-flexpipe-1.png\" alt=\"Standardize\" class=\"wp-image-43242\" style=\"width:400px;height:564px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/less-more-operating-flexpipe-1.png 345w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/less-more-operating-flexpipe-1-17x24.png 17w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/less-more-operating-flexpipe-1-26x36.png 26w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/less-more-operating-flexpipe-1-34x48.png 34w\" sizes=\"auto, (max-width: 345px) 100vw, 345px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>Put an end to tribalism by creating company-wide <a href=\"https:\/\/www.flexpipeinc.com\/us_en\/10-tips-liven-standardized-work\/\" target=\"_blank\" rel=\"noreferrer noopener\">5S standards<\/a> for workplace management. Create a daily checklist for employees and schedule workshops, so all employees and managers are aware of 5S best practices. The goal is to duplicate success so that 5S becomes routine for employees.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Does your checklist clearly define all the steps required to maintain a clean workplace?<\/li>\n\n\n\n<li>Have you created workplace standards on cleanliness and organization?<\/li>\n\n\n\n<li>Have you encouraged participation and engagement amongst your workforce?<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">5) Sustain (Shitsuke)<\/h3>\n\n\n\n<p>Build long\u2011term discipline. Sustain ensures 5S becomes a workplace behavior\u2014not a one\u2011day event. US companies often rely on audit systems, coaching, and leadership participation to reinforce habits.<\/p>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"505\" height=\"335\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1.png\" alt=\"Sustain\" class=\"wp-image-43246\" style=\"width:400px;height:265px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1.png 505w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-375x249.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-24x16.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-36x24.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-48x32.png 48w\" sizes=\"auto, (max-width: 505px) 100vw, 505px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>5S is a never-ending process. When appropriately adopted, it becomes part of a <a href=\"https:\/\/www.flexpipeinc.com\/us_en\/how-to-establish-and-sustain-a-continuous-improvement-culture-a-real-story\/\" target=\"_blank\" rel=\"noreferrer noopener\">company\u2019s culture<\/a>. Periodic <a href=\"https:\/\/www.flexpipeinc.com\/us_en\/audit-5s\/\" target=\"_blank\" rel=\"noreferrer noopener\">5S audits<\/a> and 5S meetings allow employees and management to assess progress or review non-conformance. Constant reinforcement of 5S guidelines will ensure it becomes ingrained within a workforce.<\/p>\n<\/div>\n<\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Has your team (employees, managers, and supervisors) fully adopted, endorsed, and bought into the 5S process?<\/li>\n\n\n\n<li>Have you designated weekly, monthly, and quarterly 5S assessment and review meetings?<\/li>\n\n\n\n<li>Have you created an environment where everyone\u2019s contribution and opinion are valued?<\/li>\n<\/ul>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">What Types of Waste Does 5S Help Reduce?<\/h2>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-cf94dbfe3bc3b8e84c717a81bd770a59\">Lean manufacturing defines eight types of waste (\u201cmuda\u201d). 5S directly helps identify and reduce all eight:<\/p>\n\n\n\n<ul class=\"wp-block-list has-black-color has-text-color has-link-color wp-elements-f8033cf968123cb0544411a96d28e488\">\n<li>Overproduction<\/li>\n\n\n\n<li>Waiting<\/li>\n\n\n\n<li>Transportation<\/li>\n\n\n\n<li>Motion<\/li>\n\n\n\n<li>Over\u2011processing<\/li>\n\n\n\n<li>Inventory<\/li>\n\n\n\n<li>Defects<\/li>\n\n\n\n<li>Underutilized talent<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"489\" height=\"512\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371.png\" alt=\"8 Forms of waste in Lean Manufacturing\" class=\"wp-image-43194\" style=\"aspect-ratio:0.9569377990430622;width:600px;height:auto\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371.png 489w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371-375x393.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371-24x24.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371-34x36.png 34w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Group-371-46x48.png 46w\" sizes=\"auto, (max-width: 489px) 100vw, 489px\" \/><\/figure>\n<\/div>\n\n\n<p>Many US teams use 5S as a foundation for advanced lean tools like <strong>Kaizen, Kanban, TPM<\/strong>, and <strong>Value Stream Mapping<\/strong>.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"454\" height=\"355\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2.png\" alt=\"Shadow board\" class=\"wp-image-43250\" style=\"width:400px;height:311px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2.png 454w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2-375x293.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2-24x19.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2-36x28.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-20-2-48x38.png 48w\" sizes=\"auto, (max-width: 454px) 100vw, 454px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>The goal of 5S within lean manufacturing environments is to bring stability and organization to work environments. In this sense, 5S is a critical building block of lean manufacturing. It simplifies workplace organization by creating simple-to-use guidelines that help to reduce the impact of waste in manufacturing.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p>5S was a closely guarded secret by Toyota until the late \u201980s and early \u201890s. The growth of Toyota \u2013 and the economic boom of the 80s \u2013 spurred global interest in Toyota\u2019s processes. Western industries learned about the intricacies of the Toyota Production System and soon started adopting 5S practices to tackle what the Toyota Production System defined as eight forms of waste.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-style-default is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">1. Overproduction<\/h3>\n<\/div>\n<\/div>\n\n\n\n<p>Companies often produce more than what\u2019s required \u2013 or more than what they currently have demand for. These companies believe it\u2019s best to have machines and equipment running than have them sitting idle. Unfortunately, manufacturing more than what\u2019s needed increases production and storage costs. It can lead to production errors, interrupt workflow, and increase turn-around times (TAT).<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">2. Inventory<\/h3>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"650\" height=\"385\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57.png\" alt=\"Inventory\" class=\"wp-image-43262\" style=\"width:900px;height:533px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57.png 650w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57-375x222.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57-24x14.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57-36x21.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-57-48x28.png 48w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<p>Surplus inventory increases financing costs and leads to part and material obsolescence, damage, dead stock, and higher handling and storage costs. Companies that carry too much inventory don\u2019t benefit from economies of scale when the inventory becomes damaged due to excessive handling and storage<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">3. Motion<\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p><a href=\"https:\/\/www.flexpipeinc.com\/us_en\/how-to-deal-with-motion-waste\/\" target=\"_blank\" rel=\"noreferrer noopener\">Excessive and unnecessary movements<\/a> increase cycle times and reduce production throughput. This can include having employees walk long distances for parts, tools, and materials to something as simple as having them bend, lift, stretch or reach too often.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"267\" height=\"158\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58.png\" alt=\"Motion\" class=\"wp-image-43270\" style=\"width:400px;height:236px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58.png 267w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-24x14.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-36x21.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-48x28.png 48w\" sizes=\"auto, (max-width: 267px) 100vw, 267px\" \/><\/figure>\n<\/div><\/div>\n<\/div>\n\n\n<div class=\"wp-block-image wp-image-43146\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"417\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics.png\" alt=\"Ergonomics\" class=\"wp-image-43146\" style=\"width:750px;height:499px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics.png 625w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics-375x250.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics-24x16.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics-36x24.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/Ergonomics-48x32.png 48w\" sizes=\"auto, (max-width: 625px) 100vw, 625px\" \/><figcaption class=\"wp-element-caption\">Building an ergonomic workstation reduces absenteeism and unnecessary movements.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Ergonomic workstations emphasize minimal movement so that work is seamless and the operator is not overexerting themselves with unnecessary movement.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">4. Overprocessing<\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"711\" height=\"335\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54.png\" alt=\"Overprocessing\" class=\"wp-image-43278\" style=\"width:900px;height:425px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54.png 711w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54-375x177.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54-24x11.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54-36x17.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-54-48x23.png 48w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/><\/figure>\n<\/div>\n\n\n<p>Poor work processes, bottlenecks, inefficient procedures, excessive approvals, and convoluted workflow wastes production time. Redundant and repetitive tasks add unnecessary time and increase costs while not adding value.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">5. Waiting<\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"697\" height=\"355\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56.png\" alt=\"Waiting\" class=\"wp-image-43286\" style=\"width:900px;height:458px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56.png 697w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56-375x191.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56-24x12.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56-36x18.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-56-48x24.png 48w\" sizes=\"auto, (max-width: 697px) 100vw, 697px\" \/><\/figure>\n<\/div>\n\n\n<p>Poorly structured workflow leads to idle machinery and equipment. When work operations aren\u2019t timed, it leads to machinery, equipment, and production employees waiting for material and semi-finished or work-in-process parts. Over time overproduction occurs, and excessive inventory is created.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">6. Transportation<\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"506\" height=\"309\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1.png\" alt=\"Transportation\" class=\"wp-image-43294\" style=\"width:900px;height:550px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1.png 506w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1-375x229.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1-24x15.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1-36x22.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-58-1-48x29.png 48w\" sizes=\"auto, (max-width: 506px) 100vw, 506px\" \/><\/figure>\n<\/div>\n\n\n<p>Long distances between work cells increase transit times for work-in-process and semi-finished parts.<\/p>\n\n\n\n<p>Any excessive transportation or movement of people, equipment, parts, tools, and machinery adds time and increases waste. This golf cart was optimized as a transportation waste solution.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">7. Defect<\/h3>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"364\" height=\"201\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-61EN.png\" alt=\"Defect\" class=\"wp-image-43298\" style=\"width:400px;height:221px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-61EN.png 364w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-61EN-24x13.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-61EN-36x20.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/image-61EN-48x27.png 48w\" sizes=\"auto, (max-width: 364px) 100vw, 364px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>Product defects increase costs and impact quality. Most defects must be reworked or repaired, which adds unnecessary time.<\/p>\n\n\n\n<p>Defects can occur from repetitive work processes, bad material, poor training, inadequate tools, excessive handling or transportation, or poorly defined work instructions.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">8. Unused talent<\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"505\" height=\"385\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1.png\" alt=\"Unused talent\" class=\"wp-image-43310\" style=\"width:400px;height:304px\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1.png 505w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1-375x286.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1-24x18.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1-36x27.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/02\/6-1-e1571257604955-1-1-48x37.png 48w\" sizes=\"auto, (max-width: 505px) 100vw, 505px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>Employees working in silos rob other employees of essential knowledge and expertise. Not fully leveraging an employee\u2019s ability, talents, and insight leads to employee complacency, indifference, and turnover.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p>Managers must engage employees and make them part of the continuous improvement process.<br>This assembler became a waterspider after realizing her talent for anticipating the needs.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">How Do You Implement 5S in a US Manufacturing Facility?<\/h2>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-ee65db831c3eab913398a437bb14f55d\"><strong>Below is a practical 5S implementation roadmap designed for US operations.<\/strong><\/p>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-9ac00cf961d1ea846fe5a532228b76c6\"><\/p>\n\n\n<div id=\"rank-math-howto\" class=\"rank-math-block\" >\n<div class=\"rank-math-howto-description\">\n\n<p>Implementing 5S in your company<\/p>\n\n<\/div>\n\n<div class=\"rank-math-steps \">\n<div id=\"howto-step-1763666857266\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Define the area<\/strong> and assemble a cross\u2011functional team.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666879176\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Sort<\/strong> items using red tags; relocate or dispose of unnecessary items.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666881681\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Map the workspace<\/strong>, identifying tool and material locations.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666889823\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Set in Order<\/strong> with labels, floor tape, shadow boards, and visual cues.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666897127\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Shine<\/strong> by cleaning, inspecting, and addressing abnormalities.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666902921\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Standardize<\/strong> using photos, checklists, and documented procedures.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<div id=\"howto-step-1763666911945\" class=\"rank-math-step\">\n<h3 class=\"rank-math-step-title \"><strong>Sustain<\/strong> through training, regular audits, and leadership engagement.<\/h3>\n<div class=\"rank-math-step-content \"><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<p class=\"rank-math-howto-tools\"><strong>Tools:<\/strong> <ul><li>Red\u2011tag stations<\/li><li>OSHA\u2011friendly floor tape (ANSI Z535 colors)<\/li><li>Shadow boards and modular storage systems<\/li><li>Digital audit apps or mobile checklists<\/li><\/ul><\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">Is 5S Expensive to Implement?<\/h2>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-6ec93da32d666c309d801cbf67a9efb8\"><strong>No\u20145S is one of the lowest\u2011cost lean tools, making it ideal for small and large US facilities alike.<\/strong><\/p>\n\n\n\n<p class=\"has-black-color has-text-color has-link-color wp-elements-b716233aa59b9e19110e62becaa46fce\">Most improvements rely on organization, labeling, and visual controls rather than capital purchases. Many US manufacturers begin with DIY versions of 5S before investing in modular systems.<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:5px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>One of the most impressive aspects of 5S is how little it costs to get going. There are no significant capital expenditures to justify or approve. There is no equipment or machinery to purchase and little need for outside consultants.<\/p>\n\n\n\n<p>What is required is the willingness of your management and employees to invest the time and effort to make 5S a success. A company can get going on 5S without breaking the bank. All that\u2019s needed is the following visual queues.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Tape, Signs, Labels, and Tags:<\/strong> With 5S, everything has its place. Floor tape defines work cells, high-traffic areas, potential hazards, and equipment and machinery locations. Signs, labels, and tags are needed to designate tool and material locations.<\/li>\n\n\n\n<li><strong>Shadow Boards \/ Peg Boards:<\/strong> Each work cell or area should have a shadow board or peg board for tool and consumable placement. Outline or trace the tools on the board and use hooks or stoppers to keep the tools in place. Proper labeling is also required so that similar tools aren\u2019t improperly placed.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">What Is 6S and How Does Safety Fit In?<\/h2>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:5px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Employee safety has become increasingly important in today\u2019s manufacturing environments. That\u2019s why some<a href=\"https:\/\/blog.gembaacademy.com\/2010\/08\/04\/2250\/\" target=\"_blank\" rel=\"noreferrer noopener\"> advocate for \u201csafety\u201d as the sixth criterion<\/a>. 6S systems focus on clearly defining safety risks while minimizing hazards and obstructions. Work cells should be designed with ergonomics in mind.<\/p>\n\n\n\n<p>6S expands the 5S method by adding <strong>Safety<\/strong> as the sixth element. Many US companies adopt 6S to align 5S with OSHA programs, risk mitigation efforts, and internal safety initiatives.<\/p>\n\n\n\n<p>Safety\u2011driven examples include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Marking pedestrian walkways<\/li>\n\n\n\n<li>Labeling hazardous materials areas<\/li>\n\n\n\n<li>Improving ergonomics and workstation design<\/li>\n<\/ul>\n\n\n\n<p>Employees should have minimal movements to perform work tasks without over-exerting themselves. The goal is to mitigate the impact or incidence of injury to avoid the high costs of employee absenteeism. Companies now see absenteeism as a detrimental cost driver. The goal is to reduce this waste by ensuring that worker safety is a priority.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group is-style-container\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group is-style-default block-download-creator has-black-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:70%\">\n<h3 class=\"wp-block-heading has-text-color has-link-color wp-elements-815aa2b5699ab01713117d4642e2a4d9\" style=\"color:#ff6300\"><strong><strong>Free ESD Protection Guide<\/strong><\/strong><\/h3>\n\n\n\n<p class=\"has-white-color has-text-color has-link-color wp-elements-5dfac03e0d745cbd2fb9df6087129b27\"><strong>Learn how to build safer, compliant workstations and avoid electrostatic damage.<br>Perfect for electronics, medical, aerospace, and automotive industries.<\/strong><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:30%\">\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-765c4724 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-100 is-style-fill\"><a class=\"wp-block-button__link has-custom-font-size wp-element-button\" href=\"https:\/\/www.flexpipeinc.com\/us_en\/landing-page\/esd\/\" style=\"border-radius:0px;font-size:16px\">Download the guide<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-white-color has-text-color is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<hr class=\"wp-block-separator has-text-color has-black-color has-alpha-channel-opacity has-black-background-color has-background is-style-default\"\/>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:75%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-center has-white-color has-text-color is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:90%\">\n<h2 class=\"wp-block-heading has-black-color has-text-color\">How do We Identify Waste?<\/h2>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:5px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Identifying waste can seem somewhat daunting. Where exactly do you start? Fortunately, 5S is a continuous improvement methodology. The goal is to work at it continuously. It\u2019s a task without an end date. There is no timetable. It\u2019s a continuous feedback loop where each improvement is used to learn and grow.<\/p>\n\n\n\n<p>There are several ways to identify waste. Spaghetti diagrams map the movement of parts, people, materials, and work-in-process parts on their shop floor. These diagrams can quickly identify excessive movement and uneven workflows.<\/p>\n\n\n\n<p>Another method includes using Value Stream Mapping (VSM). This highly effective lean manufacturing tool allows companies to define the current amount of waste in their processes, starting from their customer through production and shipping.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group is-style-container has-background\" style=\"background-color:#e8e8df\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group is-style-default is-vertical is-content-justification-right is-layout-flex wp-container-core-group-is-layout-cbe7ba14 wp-block-group-is-layout-flex\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:1%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:98%\">\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>However, as impressive as these tools are, nothing compares to seeing work performed in real-time.<\/p>\n<\/div><\/div>\n\n\n\n<p>Your employees hold all the keys to process improvement. They know where the bottlenecks are.<\/p>\n\n\n\n<p>They know what causes lost time and where the waste is. Leveraging their experience, know-how, and problem-solving expertise will help improve efficiencies and productivity.<\/p>\n\n\n\n<p>5S is just a tool, but your employees are critical to making it work.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:1%\"><\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">FLEXPIPE: with lean concepts in mind<\/h2>\n\n\n\n<p>An innovator in modular handling systems, Flexpipe has developed a large customer base across North America. Flexpipe is not only less expensive (30% less) than its competitors, but it also offers multiple customer-centric services to help customers easily integrate pipe and joint systems into their manufacturing systems. <\/p>\n\n\n\n<p>These services include on-site visits and assessments, custom builds, excellent after-sales support and the first-of-its-kind free <a href=\"https:\/\/www.flexpipeinc.com\/us_en\/creator-extension\/\" target=\"_blank\" rel=\"noopener\">Flexpipe Creator<\/a> extension to support material handling system designs made of modular materials.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.flexpipeinc.com\/us_en\/landing-page\/karakuri-ebook\/\"><img loading=\"lazy\" decoding=\"async\" width=\"769\" height=\"351\" src=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN.png\" alt=\"\" class=\"wp-image-45863\" srcset=\"https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN.png 769w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN-500x228.png 500w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN-375x171.png 375w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN-24x11.png 24w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN-36x16.png 36w, https:\/\/www.flexpipeinc.com\/wp-content\/uploads\/2023\/05\/teaser_karakuri-EN-48x22.png 48w\" sizes=\"auto, (max-width: 769px) 100vw, 769px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ to go further<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1763667023461\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How long does it take to implement 5S?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Small US facilities can see results within 2\u20136 weeks. Full cultural adoption may take several months.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1763667059247\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Can 5S be used outside manufacturing?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes. US offices, hospitals, labs, and distribution centers use 5S to simplify workflows and reduce waste.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1763667067082\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Does 5S help with OSHA compliance?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>While not a formal OSHA program, 5S supports important housekeeping, hazard\u2011prevention, and visibility requirements.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1763667074816\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">What KPIs should US companies track?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Audit scores, downtime, motion waste, OSHA recordables, picking accuracy, distance traveled, and workstation changeover time.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p> 5S, a continuous improvement methodology widely recognized as a building block of lean manufacturing. 5S spearheaded the rise of just-in-time (JIT), a supply chain management and lean manufacturing process that minimizes waste while maximizing efficiencies.<\/p>\n","protected":false},"author":16,"featured_media":43238,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_eb_attr":"","content-type":"","inline_featured_image":false,"sfsi_plus_gutenberg_text_before_share":"","sfsi_plus_gutenberg_show_text_before_share":"","sfsi_plus_gutenberg_icon_type":"","sfsi_plus_gutenberg_icon_alignemt":"","sfsi_plus_gutenburg_max_per_row":"","_eb_data_table":"","cybocfi_hide_featured_image":"yes","yasr_overall_rating":0,"yasr_post_is_review":"","yasr_auto_insert_disabled":"","yasr_review_type":"","footnotes":""},"categories":[325],"tags":[],"class_list":["post-43314","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lean-manufacturing"],"acf":[],"yasr_visitor_votes":{"stars_attributes":{"read_only":false,"span_bottom":false},"number_of_votes":3,"sum_votes":11},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/posts\/43314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/comments?post=43314"}],"version-history":[{"count":1,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/posts\/43314\/revisions"}],"predecessor-version":[{"id":69857,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/posts\/43314\/revisions\/69857"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/media\/43238"}],"wp:attachment":[{"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/media?parent=43314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/categories?post=43314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flexpipeinc.com\/us_en\/wp-json\/wp\/v2\/tags?post=43314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}